GATE EE · Power Systems
Generate GATE-level questions on Power Generation. Focus on: 1. Hydro, Thermal, and Nuclear power plants: Components and Basic operation. 2. Base load and Peak load stations. 3. Economics of generation: Load factor, Diversity factor, and Plant capacity factor.
6 questions · 6 PYQs · 0 AI practice · GATE EE 2027
🎯 These are sample questions
Just sign in to unlock everything. Free for all students.
Two units, rated at 100 MW and 150 MW , are enabled for economic load dispatch. When the overall incremental cost is 10,000 Rs./MWh, the units are dispatched to 50 MW and 80 MW respectively. At an overall incremental cost of , the power output of the units are 80 MW and 92 MW , respectively. The total plant MW-output (without overloading any unit) at an overall incremental cost of 11,800 Rs./MWh is ___________ (round off to the nearest integer).
The expressions of fuel cost of two thermal generating units as a function of the respective power generation and are given as where is a constant. For a given value of a, optimal dispatch requires the total load of to be shared as and . With the load remaining unchanged, the value of is increased by and optimal dispatch is carried out. The changes in and the total cost of generation, in Rs/hour will be as follows.
Base load power plants are P: wind farms. Q: run-of-river plants. R: nuclear power plants. S: diesel power plants.
Out of the following plant categories (i) Nuclear (ii) Run-of-river (iii) Pump Storage (iv) Diesel The base load power plant are
For harnessing low variable waterheads, the suitable hydraulic turbine with high percentage of reaction and runner adjustable vanes is
In the thermal power plants, the pressure in the working fluid cycle is developed by
Want unlimited AI-generated Generating Power Stations questions?
Sign up free and practice with adaptive difficulty — Easy, Medium, Hard. New questions every session.
Start practising for free →